Serving Seattle to Mount Vernon — free on-site estimates · Free on-site estimates · See current offers
Deck builder · Snohomish & King County

New Deck Construction

A new deck is a structure bolted to your house, not just a floor outside.

  • From $9,000
  • Free on-site estimate
  • 24-month warranty
5.0 · 113 reviewsLicensed & insured
Before: Worn entry stairsBefore
After: Rebuilt stairs with new railingAfter

Rebuilt stairs with new railing

Prefer to talk? Call (425) 600-7002

A new deck is a structure bolted to your house, not just a floor outside. We design it around how you use the yard, pull the permit, build the frame to last in our rain and finish it in the decking and railing you choose.

Licensed, Bonded & Insured
24-Month Workmanship Warranty
BBB A+ Accredited
5.0 from 113 Reviews
New deck construction

How we approach new deck construction

Most of the deck failures we tear out started on day one: a ledger nailed to the rim with no flashing, posts buried in concrete, joists left bare under the boards. On a new deck those details cost very little to get right and decide whether the deck lasts ten years or thirty.

We build every new deck with a through-bolted ledger flashed behind the siding, joist tape on every joist, posts on raised steel bases, and hangers and lateral connectors where the code calls for them. Then you pick the surface: pressure-treated or cedar if you like real wood, composite or PVC if you want to skip staining for good.

Ground-level platforms off a patio door usually take one to two weeks. Second-story decks with stairs, larger footings and engineered drawings take longer, mostly because of permit time. We handle the drawings and the permit and tell you up front when your city requires one.

Scope

What the job includes

  • Site visit, measurements and a simple layout you approve
  • Permit drawings and permit handling when required
  • Concrete footings sized for the load and soil
  • Pressure-treated framing, flashed ledger, joist tape, hangers and connectors
  • Decking in pressure-treated, cedar, composite or PVC
  • Railings, stairs and landings built to current code
  • Fascia, cleanup and haul-away
Our process

How the job goes, step by step

1

Plan the deck

We measure, talk through size, height, stairs and materials, and send a written price.

2

Permit and order

We prepare drawings, file the permit when needed and order materials.

3

Footings and frame

Footings, posts, beams, flashed ledger and joists with joist tape.

4

Boards, railings, stairs

Decking, fascia, railings and stairs installed and checked.

5

Final walk-through

Inspection signed off, site cleaned, warranty paperwork in your hands.

Our work

Recent deck projects

See all projects →
Composite deck with covered section
New deck and steps
New entry stairs
Pricing

What a new deck typically costs

ProjectTypical scopePrice rangeTimeline
Small ground-level deckAbout 10 × 12 ft, pressure-treated, wood railing, 2 steps$9,000 – $12,0001 week
Medium composite deckAbout 12 × 16 ft, composite boards and railing, 3 steps$17,000 – $21,5001–2 weeks
Large composite deckAbout 16 × 20 ft, composite boards, aluminum railing, 4 steps$27,000 – $34,0002–3 weeks
Second-story deckAbout 16 × 24 ft, PVC boards, aluminum railing, full stair$44,500 – $56,5003–5 weeks

Typical 2026 prices for Seattle, the Eastside and Snohomish County, calculated with the same labor rates we use in our own estimates plus current material prices. Your price depends on size, height, access, the products you choose and what we find once the area is open. Every estimate is free, in writing and based on an on-site visit. Try the calculator for your exact size.

Warranty

Backed by a 24-month workmanship warranty

Written scope

You know exactly what is included before work starts, with photos of what we found.

Our own crew

The people who quote your job are the people who do it, start to finish.

Clean site daily

Debris is hauled away and your yard is left the way we found it.

24 months covered

If our workmanship fails within two years, we come back and make it right.

Reviews

What homeowners say

5.0 average from 113 reviews on Google, Thumbtack, Angi, HomeAdvisor and Yelp. Read all our Google reviews · Leave a review

FAQ

New deck construction: common questions

How long does it take to build a new deck?
Most ground-level and standard-height decks take one to three weeks of work once materials arrive. Second-story decks and decks that need engineered drawings take longer, mostly because of permit review.
Do I need a permit for a new deck?
Usually, if the deck is attached to the house or more than about 30 inches above the ground. We check with your city or county, prepare the drawings and handle the permit as part of the job.
What decking lasts longest in our climate?
Composite and PVC boards do not rot or splinter and last 25 years or more with simple washing. Pressure-treated and cedar look great but need cleaning and sealing every two to three years.
Can you build a deck on a slope or at second-story height?
Yes. Taller decks need bigger posts, beams and footings and usually engineered drawings. The calculator and our written estimate include those costs so there are no surprises.
Free estimate

Tell us about your project

  • Licensed, bonded & insured
  • Free on-site estimates
  • 24-month workmanship warranty

Tell us what needs repair

Tell us what you're seeing. We usually reply the same day.

Book a free on-site estimate

We look at the problem, show you photos of what we find and give you a written price before any work starts.

Get a Free Estimate